Some Outstanding Projects and Contracts

Radomiro Tomic- CODELCO
(October 2009 – February 2010)
Splicing and Warranty extended in the SALFA Sulfurs Project

Minera Los Pelambres- ANTOFAGASTA MINERALS
(September 2009)
Technical advice and double splicing in the extension of the 120-cv-007 conveyor in the Upgrading Project II Bechtel Vial and Vives.

FAM Angloamerican – División Los Bronces
(April – May, 2010)
Splicing in the assembly of the overland conveyor for the expansion of the Los Bronces Division (conveyor ST 3150).

Minera Collahuasi – Angloamerican
Installation of an overland conveyor at the Rosario Crusher.

Radomiro Tomic, Codelco Norte
December 2009 – January 2010)
Changes and splicing in overland conveyor cv205.

Minera El Abra
(May – December, 2010)
Overland conveyor connections in the Sulfolix Project stockpiling system.

Compañía Minera Cerro Colorado
(2006 – 3 years)
Overland conveyor maintenance services

Compañía Minera Doña Inés de Collahuasi
(2007 – 5 years)
Overland conveyor maintenance services

Minera El Abra
(2007 – 4 years)
Overland conveyor maintenance and repair service; maintenance of pulleys and consignment of products.

Andina CODELCO
(2007 – 5 Years)
General plant equipment maintenance services; División Andina, Module E.

CODELCO CONTRACT RENEWAL
División Ventanas
(2007 – 3 years)
Repair and connection of overland conveyors.

SPENCE
(2008 – 5 years)
Conveyor belt maintenance and repair service.

MINERA SAN CRISTOBAL CONTRACT RENEWAL
(2009/2010)
Conveyor belt repair, maintenance and inspection services and lining of plant equipment.

CODELCO NORTE
(December 2007 – 5 years)
Overland conveyor lining and cold patching service.